OPS HubOPS Academy · free for everyone Sign in

Health & safety · Router installation & replacement

Pass mark 75%. Sign in with your staff account to record the result.

Read first

Working at height

Use a ladder at a 1-in-4 angle on firm ground with three points of contact. Above 2 m on a pole, clip on your harness.

Electricity

Never open powered kit. Isolate and prove dead with a voltage tester before touching terminals.

Trailing cables

Route cable along walls, clip or trunk it, and never leave a run across a walkway.

1. What angle should a ladder be set at?

2. Before working near mains sockets you should…

3. Where should loose cable go?