OPS Fibre

OPS Fibre builds and maintains the physical fibre network: street cabinets, distribution points on poles, underground chambers and the fibre that links them to every home and business.

5job types
$300–$1,600customers pay per job
$250–$700engineer wage per job
2training courses
1emergency job types

Overview

What it does

OPS Fibre builds and maintains the physical fibre network: street cabinets, distribution points on poles, underground chambers and the fibre that links them to every home and business.

On OPS Hub

OPS Hub → Internet, poles & faults (pole map, ONTs, network faults).

On the phone

Engineers take fibre jobs in OPS Work and use the job assistant for each step.

What players physically do

Everything below happens in the world, with your character, where other players can see it.

  • Install street cabinets and fit CBTs on poles
  • Pull fibre from drums along poles, walls and ducts
  • Strip, clean, cleave and fusion-splice fibre
  • Test fibre with the OTDR and power meter
  • Find breaks with the visual fault locator and re-splice them

How the system works

How OPS Fibre's part of the world fits together — and what breaks when it doesn't.

Fibre & copper network (OPS Openline)

The exchange

Exchanges house the OLT (fibre light source), the MDF (copper), core routers and power plant (rectifiers, batteries, generator).

Out to the street

Feeder fibre runs to street cabinets, then to distribution points (CBTs) on poles. Copper runs exchange → PCP cabinet → pole → house.

Into the home

A fibre drop ends in an ONT; a copper drop ends in a master socket (NTE). The ONT needs light from upstream and an active service.

Faults

Random network faults (water in joints, cracked enclosures, cut cables) take everything downstream offline and raise jobs. Several lines down together raise an outage.

Underground

Chambers, ducts and tunnels carry cables under roads. Lids are heavy and gas can build up — never work alone in one.

Every job

Every job OPS Fibre does. Open one to see who it's for, what the customer pays, what the engineer earns, the certificate needed, the parts used and exactly how the server checks the work was really done. A job is only paid when its check passes.

Fibre network build

Build the fibre network: street cabinets, distribution points on poles, and the fibre that links them back to the exchange.

Fibre installation

$1,400engineer earns $650

Lay and splice new fibre (at least 40 m) to serve the site.

Who it's for

HomesBusinessesPoliceGovernment

Money

Customer pays $1,400; the engineer is paid $650 wages when it's signed off. The rest goes to the company.

Certificate

Fibre splicing & testing required to accept this job.

How it's created

Raised automatically for customers around the city, and by customers on the phone.

How the server checks it was really done

At least 40 m of new fibre must be laid within 80 m of the job.

Parts used from company stock

60 m Distribution / feeder fiber4 × Splice protectors

Training: Fibre network build — the full step by step, tools, PPE and hazards for this job.

Network cabinet installation

$1,600engineer earns $700

Install a new street cabinet to serve the area.

Who it's for

BusinessesHomes

Money

Customer pays $1,600; the engineer is paid $700 wages when it's signed off. The rest goes to the company.

Certificate

Fibre splicing & testing required to accept this job.

How it's created

Raised automatically for customers around the city, and by customers on the phone.

How the server checks it was really done

1 × street cabinet (PCP), street cabinet (FTTC), 3-door street cabinet or 3-door street cabinet (open) must be placed within 60 m of the job, after the job was accepted.

Parts used from company stock

1 × Fiber distribution hub (FDH) cabinet

Training: Fibre network build — the full step by step, tools, PPE and hazards for this job.

Distribution point installation

$850engineer earns $400

Fit a CBT on a pole near the site.

Who it's for

HomesBusinesses

Money

Customer pays $850; the engineer is paid $400 wages when it's signed off. The rest goes to the company.

Certificate

Fibre splicing & testing required to accept this job.

How it's created

Raised automatically for customers around the city, and by customers on the phone.

How the server checks it was really done

1 × CBT / FDT (12 port), CBT / FDT (4 port), CBT / FDT (8 port) or underground closure must be placed within 80 m of the job, after the job was accepted.

Parts used from company stock

1 × Fiber distribution terminal (FDT)8 × Splice protectors

Training: Fibre network build — the full step by step, tools, PPE and hazards for this job.

Fibre testing & repair

Find and fix breaks and bad splices in the fibre network so every ONT behind them lights up again.

Fibre testing

$300engineer earns $250

OTDR and power-meter test the fibre serving the site.

Who it's for

BusinessesPoliceGovernment

Money

Customer pays $300; the engineer is paid $250 wages when it's signed off. The rest goes to the company.

Certificate

Not required — the Fibre splicing & testing course covers it.

How it's created

Raised automatically for customers around the city, and by customers on the phone.

How the server checks it was really done

Testing the fibre (OTDR, light levels): the engineer works on site within 40 m of the job for 45 seconds.

Training: Fibre testing & repair — the full step by step, tools, PPE and hazards for this job.

Fibre repair Emergency

No chargeengineer earns $500

Damaged fibre — locate the break and re-splice.

Who it's for

HomesBusinessesPoliceGovernment

Money

Customer pays nothing (fault, emergency or covered work); the engineer is paid $500 wages when it's signed off. The rest goes to the company.

Certificate

Fibre splicing & testing required to accept this job.

How it's created

Raised automatically for customers around the city, and by customers on the phone. Emergency: tight SLA, top of the board. Covered by a warranty after completion.

How the server checks it was really done

Locating the break and re-splicing: the engineer works on site within 40 m of the job for 70 seconds.

Parts used from company stock

6 × Splice protectors20 m Distribution / feeder fiber

Training: Fibre testing & repair — the full step by step, tools, PPE and hazards for this job.

Training & safety

Each group of jobs has a course in OPS Academy: the lesson below, a health & safety module, an exam and a practical. You can read all of it here, or take it on OPS Hub → Classroom, in the OPS Academy app on the phone or laptop, or at opsacademy.sa in game.

Fibre splicing & testing · certificate required

Fibre network build

Build the fibre network: street cabinets, distribution points on poles, and the fibre that links them back to the exchange.

Overview

Light starts at the OLT in the exchange, travels out through cabinets, along aerial or underground fibre to distribution points (CBTs) on poles, then down drop cables to each home's ONT. A cabinet or DP with no fibre back to a lit source is useless: every ONT behind it stays dark. Fibre installation jobs are checked by the cable you actually lay; cabinet and DP jobs by the kit you fit near the job site.

The equipment — and what it does

Street cabinet (PCP / FTTC)

Houses splitters and joints where feeder fibre fans out to an area.

/towers → OPS Openline → street cabinets.

Distribution point (CBT)

Pole-top box that serves up to 4–8 homes.

Fitted from the pole menu (G while climbing).

Fibre cable (aerial / underground)

Carries the light between exchange, cabinets and DPs.

Fibre cabling tools: run between kit, clamp to poles, or pull through ducts.

Splice enclosure / joint

Protects splices where two cables meet.

Placed on poles or in chambers from /towers.

Tools & protective equipment

Fibre fusion splicer

Melts two cleaned and cleaved fibres together into one low-loss joint.

Optical light meter / OTDR

Measures how much light arrives down a fibre, and where along it a break or bad splice is.

Ladder

Reaches walls, ceilings and pole steps. Place it at a 1-in-4 angle on firm ground.

Spade & draw rope

Opens chamber lids and pulls cables through underground ducts.

Cones & barriers

Keeps people and traffic away from open chambers, cabinets and ladders on the pavement.

Hi-vis vest & hard hat PPE

Makes you visible to traffic and protects your head from falling objects and low beams.

Fall-arrest harness PPE

Clipped to a pole or anchor point, it stops a fall when you work above 2 m.

Safety glasses PPE

Protect your eyes from fibre shards, drilling dust and laser light.

Insulated gloves PPE

Rated gloves for work near live electrical parts and for sharp metal edges.

Step by step

  1. Set out the work areaPut out cones and barriers around the pole, cabinet or chamber.
    At the job site Cones & barriers about 8 s in game
  2. Fit the cabinet or DPPlace the street cabinet from /towers, or climb and fit the CBT from the pole menu.
    /towers → OPS Openline / pole G menu Ladder about 8 s in game
  3. Lay the fibreRun fibre from the lit network to the new kit: clamp it to poles, or open a chamber and pull it through the duct with the draw rope.
    Along the route Spade & draw rope about 8 s in game
  4. Splice and protectSplice the fibres and seal the joint in an enclosure.
    At the joint Fibre fusion splicer about 8 s in game
  5. Test the lightUse the light meter at the new kit. No light means a break or bad splice — find it with the OTDR.
    At the new cabinet/DP Optical light meter / OTDR about 8 s in game
  6. Check and clear upPress Check on the job, then close chambers and remove cones.
    OPS Work → the job about 8 s in game

Health & safety — hazards and controls

Working at height

A fall from a ladder or pole can cause serious injury.

Use a ladder at a 1-in-4 angle on firm ground with three points of contact. Above 2 m on a pole, clip on your harness.

Working in the street

Traffic and pedestrians around open chambers, cabinets and poles.

Wear hi-vis and set out cones and barriers before you start. Never leave a chamber open and unattended.

Underground chambers

Lids are heavy, and gas can build up in chambers.

Lift lids with the proper key using your legs, let chambers vent, and never climb in alone.

Laser light

Invisible laser light damages eyes.

Never look into fibre ends.

What goes wrong if it's done badly

Fibre run not connected back to a lit source

The new cabinet/DP gets no light, and every home behind it stays dark.

Too little cable laid for a fibre install

The 'cable laid' check counts metres since you accepted the job. Too short and it fails.

Chamber left open

A hazard to the public. With incidents on, someone can get hurt and it's logged against you.

Wrong kit model fitted

The fixtures check only counts the models the job lists, so the job stays open.

Assessment

Safety module · 3 questionsExam · 5 questions in this modulePractical at an OPS Academy training centre (if switched on) Open in the Classroom →

Fibre splicing & testing · certificate required

Fibre testing & repair

Find and fix breaks and bad splices in the fibre network so every ONT behind them lights up again.

Overview

When several ONTs in one area go dark together, OPS Network raises an outage. The cause is usually a break in the fibre, a damaged joint or a failed splice. Work methodically: test light at the DP, then at the cabinet, then use the OTDR to measure exactly how far along the cable the break is. Repair jobs are timed on site, so you must stay at the location while the work progress fills.

The equipment — and what it does

OTDR / light meter

Shows the light level and the distance to a fault.

Use it at the DP or cabinet during the job.

Fusion splicer

Re-joins broken fibres with a low-loss splice.

Used during the on-site work.

Joint / splice tray

Holds and protects the repaired splices.

Placed on the pole or in the chamber from /towers.

Tools & protective equipment

Optical light meter / OTDR

Measures how much light arrives down a fibre, and where along it a break or bad splice is.

Fibre fusion splicer

Melts two cleaned and cleaved fibres together into one low-loss joint.

Ladder

Reaches walls, ceilings and pole steps. Place it at a 1-in-4 angle on firm ground.

Cones & barriers

Keeps people and traffic away from open chambers, cabinets and ladders on the pavement.

Hi-vis vest & hard hat PPE

Makes you visible to traffic and protects your head from falling objects and low beams.

Safety glasses PPE

Protect your eyes from fibre shards, drilling dust and laser light.

Fall-arrest harness PPE

Clipped to a pole or anchor point, it stops a fall when you work above 2 m.

Step by step

  1. Check the outage on OPS HubSee which lines are down and where — the break is between the last working point and the first dark one.
    OPS Hub → OPS Network ISP → Outages about 8 s in game
  2. Go to the job locationSet the GPS from the job page and set out cones on arrival.
    Job address Cones & barriers about 8 s in game
  3. Test the lightMeasure at the DP or cabinet and use the OTDR to find the distance to the fault.
    DP or cabinet Optical light meter / OTDR about 8 s in game
  4. Start the repairPress 'Start work' on the job and stay on site. Re-splice the broken fibres.
    At the fault Fibre fusion splicer about 8 s in game
  5. Seal the jointPut the splices in a tray and close the enclosure.
    At the joint about 8 s in game
  6. Confirm and completeWhen the time on site is reached, press Complete. Check lines come back on OPS Hub.
    OPS Work → the job about 8 s in game

Health & safety — hazards and controls

Working in the street

Traffic and pedestrians around open chambers, cabinets and poles.

Wear hi-vis and set out cones and barriers before you start. Never leave a chamber open and unattended.

Working at height

A fall from a ladder or pole can cause serious injury.

Use a ladder at a 1-in-4 angle on firm ground with three points of contact. Above 2 m on a pole, clip on your harness.

Laser light

Live fibres carry laser light.

Never look into a cut fibre — assume it's live.

What goes wrong if it's done badly

Leaving the site before the work time is done

The on-site timer stops: you must stay within range until it's complete.

Looking into a live fibre

A serious eye-safety breach. With incidents on, it's logged.

Not checking that lines came back

The outage stays open and customers stay offline, even though you closed the job.

Assessment

Safety module · 3 questionsExam · 5 questions in this modulePractical at an OPS Academy training centre (if switched on) Open in the Classroom →

Certificates

CertificateValid forNeeded for
Fibre splicing & testing60 daysFibre installation, Network cabinet installation, Distribution point installation, Fibre repair, isp_newcustomer

Stock & suppliers

Parts this company keeps in stock. Jobs use them up; managers reorder from suppliers with purchase orders, and stock below its minimum raises an alert.

PartUnitCostReorder belowSupplier
Fibre drop cable
fib-drop
m$1200LS Cable & Wire
1 h delivery · On account
Street cabinet
cab-pcp
each$9001LS Cable & Wire
1 h delivery · On account
Distribution point (CBT)
cbt
each$1403LS Cable & Wire
1 h delivery · On account
Splice protectors
splice
each$040LS Cable & Wire
1 h delivery · On account