OPS Hub · Network · Power

About OPS Hub · Network · Power › Companies › OPS Network

Internet service provider · business & home networks

OPS Network

OPS Network is the internet service provider. It sells home, business, dedicated and government broadband on top of the fibre network, installs routers, switches and Wi-Fi, configures customer networks and fixes faults and outages.

18job types
$90–$2,600customers pay per job
$120–$1,100engineer wage per job
5training courses
1emergency job types

Overview

What it does

OPS Network is the internet service provider. It sells home, business, dedicated and government broadband on top of the fibre network, installs routers, switches and Wi-Fi, configures customer networks and fixes faults and outages.

On OPS Hub

OPS Hub → OPS Network ISP (lines, packages, IP addresses, outages, tickets) and Internet, poles & faults.

On the phone

Customers order broadband in OPS Work → My broadband, run speed tests, report faults and pay bills.

What players physically do

Everything below happens in the world, with your character, where other players can see it.

  • Fit gateways, PoE switches and Wi-Fi access points and cable them with CAT6
  • Connect new customers: splice the fibre to the ONT and bring the line up
  • Configure routers on OPS Hub: firewall, port forwards, VLANs, VPN, DNS, DHCP, Wi-Fi
  • Attend speed complaints and prove the fix with a speed test
  • Restore service in an outage when several lines go down

How the system works

How OPS Network's part of the world fits together — and what breaks when it doesn't.

Fibre & copper network (OPS Openline)

The exchange

Exchanges house the OLT (fibre light source), the MDF (copper), core routers and power plant (rectifiers, batteries, generator).

Out to the street

Feeder fibre runs to street cabinets, then to distribution points (CBTs) on poles. Copper runs exchange → PCP cabinet → pole → house.

Into the home

A fibre drop ends in an ONT; a copper drop ends in a master socket (NTE). The ONT needs light from upstream and an active service.

Faults

Random network faults (water in joints, cracked enclosures, cut cables) take everything downstream offline and raise jobs. Several lines down together raise an outage.

Underground

Chambers, ducts and tunnels carry cables under roads. Lids are heavy and gas can build up — never work alone in one.

OPS Network ISP

Lines

A line is a customer, a package and an ONT. Ordering raises an install job; completing it activates the line: ONT linked, public IPs assigned, router settings pushed, first bill taken.

IP addresses

Dynamic 203.0.113.0/24, static 198.51.100.0/24 and dedicated /29 blocks from 192.0.2.0/24. Static IPs let customers host their own servers.

Router settings

LAN, DHCP, DNS, Wi-Fi, VLANs, firewall, port forwards and VPN — edited on OPS Hub and pushed to the router in game.

Monitoring

Every 30 s line states are updated (up, degraded, down). Three or more lines down within 450 m opens an outage, notifies customers and raises an emergency job.

Billing

Every 7 days; unpaid lines are suspended after 3 days' grace (the ONT is cut off) and come back when paid.

Every job

Every job OPS Network does. Open one to see who it's for, what the customer pays, what the engineer earns, the certificate needed, the parts used and exactly how the server checks the work was really done. A job is only paid when its check passes.

Router installation & replacement

Fit or swap the customer's gateway router so the whole property gets internet. The router takes the line from the ONT and shares it over Wi-Fi and Ethernet.

Router installation

$750engineer earns $350

Fit and set up a new router / gateway for the customer.

Who it's for

HomesBusinesses

Money

Customer pays $750; the engineer is paid $350 wages when it's signed off. The rest goes to the company.

Certificate

Network installation required to accept this job.

How it's created

Raised automatically for customers around the city, and by customers on the phone.

How the server checks it was really done

1 × OPS Gateway Pro, OPS Gateway Mini, OPS EdgeLink E5, OPS EdgeLink E7, OPS HomeRouter AX4 or OPS Mesh M1 must be placed and powered within 40 m of the job, after the job was accepted.

Parts used from company stock

1 × Wi-Fi gateway router10 m CAT6 cable2 × RJ45 connectors

Training: Router installation & replacement — the full step by step, tools, PPE and hazards for this job.

Router replacement

$600engineer earns $300

Customer's router has failed — fit a replacement gateway.

Who it's for

HomesBusinesses

Money

Customer pays $600; the engineer is paid $300 wages when it's signed off. The rest goes to the company.

Certificate

Not required — the Network installation course covers it.

How it's created

Raised automatically for customers around the city, and by customers on the phone. Covered by a warranty after completion.

How the server checks it was really done

1 × OPS Gateway Pro, OPS Gateway Mini, OPS EdgeLink E5, OPS EdgeLink E7, OPS HomeRouter AX4 or OPS Mesh M1 must be placed and powered within 40 m of the job, after the job was accepted.

Parts used from company stock

1 × Wi-Fi gateway router

Training: Router installation & replacement — the full step by step, tools, PPE and hazards for this job.

LAN, Wi-Fi & PoE installation

Build the network inside a building: switches, PoE, access points and structured CAT6 cabling. A business network ties all of it together.

Switch installation

$650engineer earns $300

Install a managed PoE switch in the comms cupboard.

Who it's for

BusinessesPoliceGovernment

Money

Customer pays $650; the engineer is paid $300 wages when it's signed off. The rest goes to the company.

Certificate

Network installation required to accept this job.

How it's created

Raised automatically for customers around the city, and by customers on the phone.

How the server checks it was really done

1 × OPS Switch 8 PoE must be placed and powered within 40 m of the job, after the job was accepted.

Parts used from company stock

1 × PoE switch 8-port15 m CAT6 cable4 × RJ45 connectors

Training: LAN, Wi-Fi & PoE installation — the full step by step, tools, PPE and hazards for this job.

Wi-Fi installation

$950engineer earns $450

Install two access points for full Wi-Fi coverage.

Who it's for

HomesBusinessesPoliceGovernment

Money

Customer pays $950; the engineer is paid $450 wages when it's signed off. The rest goes to the company.

Certificate

Network installation required to accept this job.

How it's created

Raised automatically for customers around the city, and by customers on the phone.

How the server checks it was really done

2 × OPS Halo access point, OPS Halo access point, OPS Beam access point, OPS Beam access point or OPS Mesh M1 must be placed and powered within 50 m of the job, after the job was accepted.

Parts used from company stock

2 × Wi-Fi 6 access point30 m CAT6 cable4 × RJ45 connectors

Training: LAN, Wi-Fi & PoE installation — the full step by step, tools, PPE and hazards for this job.

PoE installation

$900engineer earns $450

Power ceiling access points over PoE from a PoE switch.

Who it's for

BusinessesPoliceGovernment

Money

Customer pays $900; the engineer is paid $450 wages when it's signed off. The rest goes to the company.

Certificate

Network installation required to accept this job.

How it's created

Raised automatically for customers around the city, and by customers on the phone.

How the server checks it was really done

1 × OPS Halo access point, OPS Halo access point, OPS Beam access point or OPS Beam access point must be placed within 50 m of the job, after the job was accepted.

Parts used from company stock

1 × Wi-Fi 6 access point20 m CAT6 cable2 × RJ45 connectors

Training: LAN, Wi-Fi & PoE installation — the full step by step, tools, PPE and hazards for this job.

CAT6 installation

$600engineer earns $300

Run and terminate CAT6 to new outlets (at least 20 m).

Who it's for

BusinessesPoliceGovernmentHomes

Money

Customer pays $600; the engineer is paid $300 wages when it's signed off. The rest goes to the company.

Certificate

Network installation required to accept this job.

How it's created

Raised automatically for customers around the city, and by customers on the phone.

How the server checks it was really done

At least 20 m of new cable must be laid within 50 m of the job.

Parts used from company stock

40 m CAT6 cable4 × RJ45 connectors

Training: LAN, Wi-Fi & PoE installation — the full step by step, tools, PPE and hazards for this job.

Business network installation

$2,600engineer earns $1,100

Gateway, PoE switch and two access points, all cabled.

Who it's for

BusinessesPoliceGovernment

Money

Customer pays $2,600; the engineer is paid $1,100 wages when it's signed off. The rest goes to the company.

Certificate

Network installation required to accept this job.

How it's created

Raised automatically for customers around the city, and by customers on the phone.

How the server checks it was really done

Every part must be in place: 1 × Gateway; 1 × PoE switch; 2 × Access points; 1 × CAT6.

Parts used from company stock

1 × Wi-Fi gateway router1 × PoE switch 8-port2 × Wi-Fi 6 access point60 m CAT6 cable10 × RJ45 connectors

Training: LAN, Wi-Fi & PoE installation — the full step by step, tools, PPE and hazards for this job.

Network fault finding & support

Find out why a customer's internet is slow or down and put it right. Speed issues are signed off with a speed test that reaches 70% of the package.

Speed issue

No chargeengineer earns $200

Customer reports slow internet — attend, find the cause and prove it with a speed test of at least 70 % of their package.

Who it's for

HomesBusinesses

Money

Customer pays nothing (fault, emergency or covered work); the engineer is paid $200 wages when it's signed off. The rest goes to the company.

Certificate

Not required — the Network support course covers it.

How it's created

Raised by a customer, a fault or staff for a specific site. Covered by a warranty after completion.

How the server checks it was really done

A speed test at the property must reach 70% of the customer's plan.

Training: Network fault finding & support — the full step by step, tools, PPE and hazards for this job.

Network troubleshooting

$250engineer earns $300

Intermittent drop-outs on site — find and fix the fault.

Who it's for

BusinessesPoliceGovernment

Money

Customer pays $250; the engineer is paid $300 wages when it's signed off. The rest goes to the company.

Certificate

Not required — the Network support course covers it.

How it's created

Raised automatically for customers around the city, and by customers on the phone. Covered by a warranty after completion.

How the server checks it was really done

Fault finding on the customer network: the engineer works on site within 30 m of the job for 60 seconds.

Training: Network fault finding & support — the full step by step, tools, PPE and hazards for this job.

Internet outage Emergency

No chargeengineer earns $400

Customer has no internet — emergency callout.

Who it's for

BusinessesPoliceGovernment

Money

Customer pays nothing (fault, emergency or covered work); the engineer is paid $400 wages when it's signed off. The rest goes to the company.

Certificate

Not required — the Network support course covers it.

How it's created

Raised by a customer, a fault or staff for a specific site. Emergency: tight SLA, top of the board. Covered by a warranty after completion.

How the server checks it was really done

Restoring the service: the engineer works on site within 30 m of the job for 50 seconds.

Training: Network fault finding & support — the full step by step, tools, PPE and hazards for this job.

New fibre broadband installation

Connect a new OPS Network customer: fibre to the property, a lit ONT and a router. When you finish, the line goes live and is billed automatically.

New customer installation (fibre)

$1,800engineer earns $900

Connect a new customer: ONT online with live service.

Who it's for

HomesBusinessesPoliceGovernment

Money

Customer pays $1,800; the engineer is paid $900 wages when it's signed off. The rest goes to the company.

Certificate

Fibre splicing & testing required to accept this job.

How it's created

Raised automatically for customers around the city, and by customers on the phone.

How the server checks it was really done

The customer's ONT must be online with live fibre and an active service.

Parts used from company stock

1 × Fiber ONT (XGS-PON)5 m CAT6 cable2 × RJ45 connectors

Training: New fibre broadband installation — the full step by step, tools, PPE and hazards for this job.

Router & network configuration

Change the customer's router settings remotely: firewall, port forwards, VLANs, VPN, DNS, DHCP and Wi-Fi. The check confirms the setting changed after you accepted the job.

Firewall configuration

$300engineer earns $250

Add the firewall rules the customer needs (OPS Hub → their line → Router settings).

Who it's for

BusinessesPoliceGovernment

Money

Customer pays $300; the engineer is paid $250 wages when it's signed off. The rest goes to the company.

Certificate

Not required — the Network configuration course covers it.

How it's created

Raised by a customer, a fault or staff for a specific site.

How the server checks it was really done

The firewall setting on the customer's router must really have been changed after the job was accepted.

Training: Router & network configuration — the full step by step, tools, PPE and hazards for this job.

Port forwarding set-up

$150engineer earns $180

Forward the ports for the customer’s server / CCTV.

Who it's for

BusinessesPoliceGovernmentHomes

Money

Customer pays $150; the engineer is paid $180 wages when it's signed off. The rest goes to the company.

Certificate

Not required — the Network configuration course covers it.

How it's created

Raised by a customer, a fault or staff for a specific site.

How the server checks it was really done

The forwards setting on the customer's router must really have been changed after the job was accepted.

Training: Router & network configuration — the full step by step, tools, PPE and hazards for this job.

VLAN configuration

$350engineer earns $300

Split staff and guest networks into VLANs.

Who it's for

BusinessesPoliceGovernment

Money

Customer pays $350; the engineer is paid $300 wages when it's signed off. The rest goes to the company.

Certificate

Not required — the Network configuration course covers it.

How it's created

Raised by a customer, a fault or staff for a specific site.

How the server checks it was really done

The vlans setting on the customer's router must really have been changed after the job was accepted.

Training: Router & network configuration — the full step by step, tools, PPE and hazards for this job.

VPN configuration

$450engineer earns $350

Set up a site-to-site or remote-access VPN.

Who it's for

BusinessesPoliceGovernment

Money

Customer pays $450; the engineer is paid $350 wages when it's signed off. The rest goes to the company.

Certificate

Not required — the Network configuration course covers it.

How it's created

Raised by a customer, a fault or staff for a specific site.

How the server checks it was really done

The vpn setting on the customer's router must really have been changed after the job was accepted.

Training: Router & network configuration — the full step by step, tools, PPE and hazards for this job.

DNS configuration

$120engineer earns $150

Point the customer’s network at the right DNS servers.

Who it's for

BusinessesPoliceGovernmentHomes

Money

Customer pays $120; the engineer is paid $150 wages when it's signed off. The rest goes to the company.

Certificate

Not required — the Network configuration course covers it.

How it's created

Raised by a customer, a fault or staff for a specific site.

How the server checks it was really done

The dns setting on the customer's router must really have been changed after the job was accepted.

Training: Router & network configuration — the full step by step, tools, PPE and hazards for this job.

DHCP / IP configuration

$150engineer earns $180

Reserve fixed LAN addresses for the customer’s devices.

Who it's for

BusinessesPoliceGovernment

Money

Customer pays $150; the engineer is paid $180 wages when it's signed off. The rest goes to the company.

Certificate

Not required — the Network configuration course covers it.

How it's created

Raised by a customer, a fault or staff for a specific site.

How the server checks it was really done

The dhcp setting on the customer's router must really have been changed after the job was accepted.

Training: Router & network configuration — the full step by step, tools, PPE and hazards for this job.

Secure the Wi-Fi

$90engineer earns $120

Set a strong Wi-Fi password (applied to the router).

Who it's for

BusinessesPoliceGovernmentHomes

Money

Customer pays $90; the engineer is paid $120 wages when it's signed off. The rest goes to the company.

Certificate

Not required — the Network configuration course covers it.

How it's created

Raised by a customer, a fault or staff for a specific site.

How the server checks it was really done

The wifi setting on the customer's router must really have been changed after the job was accepted.

Training: Router & network configuration — the full step by step, tools, PPE and hazards for this job.

Training & safety

Each group of jobs has a course in OPS Academy: the lesson below, a health & safety module, an exam and a practical. You can read all of it here, or take it on OPS Hub → Classroom, in the OPS Academy app on the phone or laptop, or at opsacademy.sa in game.

Network installation · certificate required

Router installation & replacement

Fit or swap the customer's gateway router so the whole property gets internet. The router takes the line from the ONT and shares it over Wi-Fi and Ethernet.

Overview

The gateway router is the heart of every customer network. Its WAN port takes the internet from the fibre ONT. Every switch, access point, laptop, NVR and server in the building then gets online through it. A router on the wrong port, with no power or not cabled to a live ONT, leaves the customer with nothing — and their CCTV remote viewing, laptops and self-hosted websites go down with it.

The equipment — and what it does

Gateway router (OPS Gateway Pro / Mini, OPS EdgeLink E5 / E7, OPS HomeRouter AX4)

Routes traffic between the customer's LAN and the internet, hands out addresses (DHCP) and runs the firewall and Wi-Fi.

Placed as a Wi-Fi/router tower from the /towers menu. It must be powered (socket nearby or PoE) and cabled to the ONT to show as online.

Fibre ONT

Turns the light on the customer's fibre into Ethernet. It needs light from a cabinet and an active OPS Network service.

Usually already fitted on the wall. [E] shows its light and service status.

CAT6 patch lead

Connects the ONT LAN port to the router WAN port.

Pull CAT6 from the nearest box, then terminate one end on the ONT and the other on the router.

Tools & protective equipment

RJ45 crimper & cable tester

Fits RJ45 plugs onto CAT6 and proves all eight cores are connected in the right order.

Cordless drill & fixings

Drills walls for cable entry and fixes brackets, cameras and boxes with the right plugs and screws.

Engineer laptop & console cable

Configures routers, NVRs and servers, runs speed tests and opens OPS Hub.

Label printer

Labels both ends of every cable and port so the next engineer knows what is what.

Hi-vis vest & hard hat PPE

Makes you visible to traffic and protects your head from falling objects and low beams.

Step by step

  1. Check the ONT has lightWalk to the ONT and press [E]. You need a lit ONT with an active service before a router can get online. If it's dark, the job is really a fibre fault — tell dispatch.
    At the customer's ONT, usually by the front door Optical light meter / OTDR about 8 s in game
  2. Fit the routerOpen /towers → OPS Network and place the router somewhere central, near a socket. If you're swapping, remove the old router first.
    /towers → your network section Cordless drill & fixings about 8 s in game
  3. Pull and terminate CAT6Use 'Pull CAT6 from the nearest box' and run the cable from the ONT to the router along the walls. Crimp an RJ45 onto each end and terminate it into the kit.
    From the nearest CAT6 box RJ45 crimper & cable tester about 8 s in game
  4. Test the cableUse the cable tester. An unterminated or loose end means no link.
    Both ends of the run RJ45 crimper & cable tester about 8 s in game
  5. Power on and check it's onlineMake sure the router has a socket within reach. Open the job in OPS Work and press Check — it must show the router powered and online.
    OPS Work → the job → Work check Engineer laptop & console cable about 8 s in game
  6. Label and tidyLabel both ends of the cable and clip loose runs to the wall.
    At the router Label printer about 8 s in game

Health & safety — hazards and controls

Working at height

A fall from a ladder or pole can cause serious injury.

Use a ladder at a 1-in-4 angle on firm ground with three points of contact. Above 2 m on a pole, clip on your harness.

Electricity

Mains voltage can give a fatal shock and cause burns.

Never open powered kit. Isolate and prove dead with a voltage tester before touching terminals.

Trailing cables

Customers and staff trip over loose cable during the job.

Route cable along walls, clip or trunk it, and never leave a run across a walkway.

What goes wrong if it's done badly

Router placed with no socket nearby

It shows unpowered, the Work check fails and the job stays open until you fix it.

Cable not terminated at both ends

There's no link. The router stays offline and everything behind it — Wi-Fi, CCTV remote viewing, laptops — has no internet.

Installed before accepting the job

Only kit placed after you accept counts. The check won't see it, so you redo the work.

ONT had no light and you fitted the router anyway

The router never gets online. The real fault (fibre) goes unreported and the customer's SLA deadline passes.

Finished after the SLA due time

The job is logged as an SLA breach against the company, and it shows on the dashboard.

Assessment

Safety module · 3 questionsExam · 5 questions in this modulePractical at an OPS Academy training centre (if switched on) Open in the Classroom →

Network installation · certificate required

LAN, Wi-Fi & PoE installation

Build the network inside a building: switches, PoE, access points and structured CAT6 cabling. A business network ties all of it together.

Overview

Behind every router there's a local network. Switches add ports, PoE switches power access points and cameras down the cable, and access points spread Wi-Fi through the building. Good cabling makes it all reliable: runs under 100 m, terminated properly, labelled and tidy. A business installation is the full set: gateway, PoE switch, two access points and all the CAT6 between them.

The equipment — and what it does

PoE switch

Adds Ethernet ports and powers devices such as access points and IP cameras over the same cable, up to its PoE budget.

Placed from /towers. Cable it back to the router; every device you plug in uses part of its PoE budget.

Wi-Fi access point (ceiling or wall)

Broadcasts the customer's Wi-Fi. Phones in range use Wi-Fi instead of mobile data.

Placed from /towers and cabled to a PoE switch, or powered from a socket.

CAT6 cable & box

305 m boxes of network cable. Each run should stay under 100 m.

'Pull CAT6 from the nearest box', route along the walls, then crimp and terminate both ends.

Trunking

Plastic channel that hides and protects cable runs.

Placed from the cabling menu along walls and ceilings.

Tools & protective equipment

RJ45 crimper & cable tester

Fits RJ45 plugs onto CAT6 and proves all eight cores are connected in the right order.

Cordless drill & fixings

Drills walls for cable entry and fixes brackets, cameras and boxes with the right plugs and screws.

Ladder

Reaches walls, ceilings and pole steps. Place it at a 1-in-4 angle on firm ground.

Label printer

Labels both ends of every cable and port so the next engineer knows what is what.

Engineer laptop & console cable

Configures routers, NVRs and servers, runs speed tests and opens OPS Hub.

Hi-vis vest & hard hat PPE

Makes you visible to traffic and protects your head from falling objects and low beams.

Safety glasses PPE

Protect your eyes from fibre shards, drilling dust and laser light.

Step by step

  1. Survey the buildingWalk the site and decide where the switch and access points go. Access points should be central and high; switches go near the router.
    On site about 8 s in game
  2. Fit the switchPlace the (PoE) switch from /towers near the router.
    /towers → OPS Network Cordless drill & fixings about 8 s in game
  3. Fit the access pointsUse the ladder to place ceiling or wall access points.
    /towers → OPS Network Ladder about 8 s in game
  4. Run the CAT6Pull CAT6 from the box: router → switch, then switch → each access point. Keep runs under 100 m and in trunking where people walk.
    From the nearest CAT6 box RJ45 crimper & cable tester about 8 s in game
  5. Crimp and terminateCrimp an RJ45 on every end and terminate it into the kit.
    Every cable end RJ45 crimper & cable tester about 8 s in game
  6. Test and checkTest each run, then press Check on the job in OPS Work. Every device must be powered and linked.
    OPS Work → the job RJ45 crimper & cable tester about 8 s in game
  7. Label everythingLabel both ends of each run and each switch port.
    Switch and outlets Label printer about 8 s in game

Health & safety — hazards and controls

Working at height

A fall from a ladder or pole can cause serious injury.

Use a ladder at a 1-in-4 angle on firm ground with three points of contact. Above 2 m on a pole, clip on your harness.

Trailing cables

Customers and staff trip over loose cable during the job.

Route cable along walls, clip or trunk it, and never leave a run across a walkway.

Drilling

Drilling into hidden cables or pipes, and dust in your eyes.

Check walls before drilling and wear safety glasses.

Electricity

Mains voltage can give a fatal shock and cause burns.

Never open powered kit. Isolate and prove dead with a voltage tester before touching terminals.

What goes wrong if it's done badly

Too many PoE devices on one switch

Devices past the PoE budget get no power and show as unpowered. Add a second switch or use sockets.

Access point not cabled back to the router

It powers up but has no uplink, so phones connect to Wi-Fi with no internet.

Loose or unterminated cable ends

No link. The Work check shows the device as not connected and the job can't be completed.

Fewer devices than the job needs

'All parts' checks need every item. The check lists what's missing and the job stays open.

Assessment

Safety module · 3 questionsExam · 5 questions in this modulePractical at an OPS Academy training centre (if switched on) Open in the Classroom →

Network support

Network fault finding & support

Find out why a customer's internet is slow or down and put it right. Speed issues are signed off with a speed test that reaches 70% of the package.

Overview

Most 'no internet' calls are one of four things: the ONT has no light (fibre fault), the line is suspended or unpaid, the router is unplugged or misconfigured, or Wi-Fi coverage is poor. Work from the outside in: the line on OPS Hub, then the ONT, the router, and the Wi-Fi. A speed job is finished when an OPS Work speed test at the property reaches at least 70% of the customer's package.

The equipment — and what it does

Customer line on OPS Hub

Shows the line state (up, degraded or down), billing, IP addresses and router settings.

OPS Hub → OPS Network ISP → the line, or OPS Work → 'Line at this address'.

OPS Work speed test

Measures download, upload and ping at the property against the package speed.

OPS Work → 'Line at this address' → Run a speed test, while standing inside.

ONT status

Light and service state of the fibre terminal.

[E] at the ONT.

Tools & protective equipment

Engineer laptop & console cable

Configures routers, NVRs and servers, runs speed tests and opens OPS Hub.

Optical light meter / OTDR

Measures how much light arrives down a fibre, and where along it a break or bad splice is.

RJ45 crimper & cable tester

Fits RJ45 plugs onto CAT6 and proves all eight cores are connected in the right order.

Hi-vis vest & hard hat PPE

Makes you visible to traffic and protects your head from falling objects and low beams.

Step by step

  1. Check the lineIn OPS Work → 'Line at this address' (or on OPS Hub), check the line state, billing and any outage in the area.
    OPS Work → Line at this address Engineer laptop & console cable about 8 s in game
  2. Check the ONT[E] at the ONT. If it's dark it's a fibre fault — raise it. If it's lit but has no service, the line needs provisioning.
    At the ONT Optical light meter / OTDR about 8 s in game
  3. Check the router and cablingMake sure the router is powered and the ONT → router cable is terminated at both ends. Re-crimp anything loose.
    Router and cable runs RJ45 crimper & cable tester about 8 s in game
  4. Check Wi-Fi coverageWeak signal in part of the building needs another access point (raise a Wi-Fi installation job).
    Around the property about 8 s in game
  5. Run the speed testStand inside and run the speed test. It needs at least 70% of the package for a speed job.
    OPS Work → speed test Engineer laptop & console cable about 8 s in game
  6. Close it offPress Check on the job. Tell the customer what was wrong.
    OPS Work → the job about 8 s in game

Health & safety — hazards and controls

Electricity

Mains voltage can give a fatal shock and cause burns.

Never open powered kit. Isolate and prove dead with a voltage tester before touching terminals.

Customer data & privacy

Router settings, passwords and camera footage are private.

Only change what the job needs. Never share Wi-Fi passwords or footage, and log out of customer systems when you finish.

Trailing cables

Customers and staff trip over loose cable during the job.

Route cable along walls, clip or trunk it, and never leave a run across a walkway.

What goes wrong if it's done badly

Speed test run outside the property

It doesn't count — the test has to be near the line's address.

Speed test below 70% of the package

The speed check fails. Fix the cause (bad cable, too many devices, router placement) and test again.

Ignoring an area outage

You can't fix it on site. The outage is the network team's job, and you lose time and the SLA.

Suspended line for non-payment

The ONT is cut off on purpose. Nothing works until the customer pays; it isn't a fault.

Assessment

Safety module · 3 questionsExam · 5 questions in this modulePractical at an OPS Academy training centre (if switched on) Open in the Classroom →

Fibre splicing & testing · certificate required

New fibre broadband installation

Connect a new OPS Network customer: fibre to the property, a lit ONT and a router. When you finish, the line goes live and is billed automatically.

Overview

A new line runs from the street cabinet through the distribution point (CBT) on the pole, down a drop cable to the house, and into an ONT on the wall. When the ONT has light and the job is completed, OPS Network activates the line: it links the ONT, assigns public IP addresses, pushes the router settings and takes the first bill. If any link in that chain is missing, the customer gets nothing.

The equipment — and what it does

Distribution point (CBT)

The box on the pole where customer drops are spliced to the network fibre.

Fitted from the pole menu (G while climbing) or /towers → OPS Openline.

Fibre drop cable

Carries light from the CBT to the house.

Run fibre from the CBT to the house with the fibre cabling tools.

ONT

Turns light into Ethernet. 'Online' means light plus service.

Placed inside on a wall from /towers, then terminated with the drop.

Router

Shares the connection around the home.

Placed and cabled to the ONT LAN port with CAT6.

Tools & protective equipment

Ladder

Reaches walls, ceilings and pole steps. Place it at a 1-in-4 angle on firm ground.

Fibre fusion splicer

Melts two cleaned and cleaved fibres together into one low-loss joint.

Optical light meter / OTDR

Measures how much light arrives down a fibre, and where along it a break or bad splice is.

Cordless drill & fixings

Drills walls for cable entry and fixes brackets, cameras and boxes with the right plugs and screws.

RJ45 crimper & cable tester

Fits RJ45 plugs onto CAT6 and proves all eight cores are connected in the right order.

Hi-vis vest & hard hat PPE

Makes you visible to traffic and protects your head from falling objects and low beams.

Fall-arrest harness PPE

Clipped to a pole or anchor point, it stops a fall when you work above 2 m.

Safety glasses PPE

Protect your eyes from fibre shards, drilling dust and laser light.

Step by step

  1. Set out the sitePut out cones at the pole and wear your hi-vis.
    At the customer's pole Cones & barriers about 8 s in game
  2. Climb and connect at the CBTClimb the pole with the ladder, clip on, and fit or use the CBT. Splice the drop to a spare fibre.
    Pole → CBT (G menu while climbing) Fibre fusion splicer about 8 s in game
  3. Run the drop to the houseRun the drop cable from the CBT to the house wall and through to the ONT position.
    Pole to house Cordless drill & fixings about 8 s in game
  4. Fit and terminate the ONTPlace the ONT inside and terminate the drop into it. Check it lights up with [E].
    Inside the property Optical light meter / OTDR about 8 s in game
  5. Fit the routerPlace the router and connect it to the ONT with CAT6.
    Inside the property RJ45 crimper & cable tester about 8 s in game
  6. Complete the jobPress Check: the ONT must be online. Completing the job activates the line automatically.
    OPS Work → the job about 8 s in game

Health & safety — hazards and controls

Working at height

A fall from a ladder or pole can cause serious injury.

Use a ladder at a 1-in-4 angle on firm ground with three points of contact. Above 2 m on a pole, clip on your harness.

Working in the street

Traffic and pedestrians around open chambers, cabinets and poles.

Wear hi-vis and set out cones and barriers before you start. Never leave a chamber open and unattended.

Laser light

Fibre carries invisible laser light that can damage your eyes.

Never look into a fibre end or connector. Use the light meter.

Fibre shards

Cleaved glass splinters get into skin and eyes.

Wear safety glasses and bin offcuts in the shard pot.

What goes wrong if it's done badly

Drop connected to a CBT with no light from the cabinet

The ONT stays dark. The check 'ONT online' fails and the line can't be activated.

ONT placed before accepting the job

It doesn't count for the check — fit a fresh one after accepting.

No router fitted

The line goes live, but the customer has no Wi-Fi and calls back with a fault (a new job, possibly an SLA breach).

Working on the pole without a harness

With safety incidents on, you can fall and get hurt. The job is logged with the safety briefing skipped.

Assessment

Safety module · 3 questionsExam · 5 questions in this modulePractical at an OPS Academy training centre (if switched on) Open in the Classroom →

Network configuration

Router & network configuration

Change the customer's router settings remotely: firewall, port forwards, VLANs, VPN, DNS, DHCP and Wi-Fi. The check confirms the setting changed after you accepted the job.

Overview

OPS Network keeps every customer's router configuration on OPS Hub. Changes are pushed to the router in game within a minute, and Wi-Fi settings change the real router's network. Port forwards decide whether a self-hosted website works: forward 80 and 443 to the web server or visitors get 'connection refused'. A configuration job is checked by looking at the line's settings, which must have been changed after you accepted the job.

The equipment — and what it does

Router settings editor

LAN, DHCP and reservations, DNS, Wi-Fi, guest Wi-Fi, VLANs, firewall rules, port forwards and VPN.

OPS Hub → OPS Network ISP → the customer's line → Router settings → Save.

Port forward

Sends traffic arriving on an outside port to a device inside (e.g. 443 → the web server).

Router settings → Port forwards → + Add.

VLAN

Splits one network into isolated parts (e.g. guests and CCTV away from staff).

Router settings → VLANs → + Add, tick 'isolated'.

Tools & protective equipment

Engineer laptop & console cable

Configures routers, NVRs and servers, runs speed tests and opens OPS Hub.

Step by step

  1. Read the requestOpen the job in OPS Work and read exactly what the customer wants.
    OPS Work → the job about 8 s in game
  2. Open the lineOn OPS Hub, open OPS Network ISP → the customer's line → Router settings.
    OPS Hub Engineer laptop & console cable about 8 s in game
  3. Make the changeAdd the firewall rule, forward, VLAN, VPN, DNS, DHCP reservation or Wi-Fi password the job asks for.
    Router settings editor Engineer laptop & console cable about 8 s in game
  4. Save and waitSave. The router picks the change up in game within a minute.
    OPS Hub Engineer laptop & console cable about 8 s in game
  5. CheckPress Check on the job — it reads the saved settings and confirms the change.
    OPS Work → the job about 8 s in game

Health & safety — hazards and controls

Customer data & privacy

Router settings, passwords and camera footage are private.

Only change what the job needs. Never share Wi-Fi passwords or footage, and log out of customer systems when you finish.

Locking the customer out

A wrong firewall rule or Wi-Fi change cuts the customer off.

Change only what was asked, note the old value, and test afterwards.

What goes wrong if it's done badly

Settings changed before accepting the job

The check needs a change after acceptance. Make the change again, or tweak and save.

Wrong port forwarded for a website

Visitors get 'connection refused' and the customer's self-hosted site stays down.

Open Wi-Fi left behind

The Wi-Fi job fails: it needs a password set.

Firewall default changed to allow

Everything inside is exposed. It's a serious security mistake that the customer can complain about.

Assessment

Safety module · 3 questionsExam · 5 questions in this modulePractical at an OPS Academy training centre (if switched on) Open in the Classroom →

Certificates

CertificateValid forNeeded for
Network installation60 daysRouter installation, Switch installation, Wi-Fi installation, PoE installation, CAT6 installation, Business network installation

Stock & suppliers

Parts this company keeps in stock. Jobs use them up; managers reorder from suppliers with purchase orders, and stock below its minimum raises an alert.

PartUnitCostReorder belowSupplier
OPS Gateway router
rtr-gw
each$1803Meridian Networks
2 h delivery · 30 days
PoE switch 8-port
sw-poe8
each$953Meridian Networks
2 h delivery · 30 days
Wi-Fi 6 access point
ap-wifi6
each$1104Meridian Networks
2 h delivery · 30 days
Fibre ONT
ont
each$604LS Cable & Wire
1 h delivery · On account
CAT6 cable
cat6
m$1150LS Cable & Wire
1 h delivery · On account
RJ45 connectors
rj45
each$050LS Cable & Wire
1 h delivery · On account

Other companies