OPS Hub · Network · Power

About OPS Hub · Network · Power › Companies › San Andreas Power & Light

Electricity network & customer supplies

San Andreas Power & Light

San Andreas Power & Light is the electricity company: power stations, transmission, substations, feeders, pole transformers and every customer supply, including EV chargers.

2job types
$1,100–$1,500customers pay per job
$450–$700engineer wage per job
1training course
0emergency job types

Overview

What it does

San Andreas Power & Light is the electricity company: power stations, transmission, substations, feeders, pole transformers and every customer supply, including EV chargers.

On OPS Hub

OPS Hub → Grid control and Customers, meters & solar.

On the phone

Crews get fault jobs and dispatch in OPS Work.

What players physically do

Everything below happens in the world, with your character, where other players can see it.

  • Build generation, pylons and substations, and string the cable
  • Connect a house: service drop, cut-out, meter, consumer unit
  • Fit EV wallboxes and charging posts
  • Operate breakers and reclosers and repair faults
  • Work safely on poles with the right PPE and tools

How the system works

How San Andreas Power & Light's part of the world fits together — and what breaks when it doesn't.

Electricity: San Andreas Power & Light

From station to socket

Power stations feed 400 kV transmission to substations, which step it down to 11 kV feeders, then pole transformers to LV, and a service drop to each property's cut-out and meter. The consumer unit then feeds sockets, lights and chargers.

Substations

A substation needs protection, a DC battery and earthing to energise. An RTU lets Grid control switch it remotely.

Grid control

OPS Hub → Grid control shows load, faults and switching. Feeders can trip on faults or be switched for maintenance.

What depends on it

Sockets, lighting, EV chargers, routers, ONTs, NVRs, masts, fuel pumps and data-centre UPS charging all need live mains. A feeder outage cascades: no power means no internet, CCTV or mobile signal unless there's battery backup.

Safety

Always isolate, lock off and prove dead before work. Never assume a circuit is dead.

Every job

Every job San Andreas Power & Light does. Open one to see who it's for, what the customer pays, what the engineer earns, the certificate needed, the parts used and exactly how the server checks the work was really done. A job is only paid when its check passes.

Electrical supply & EV charging

Connect new electricity supplies and EV chargers so sockets and chargers are live.

New electricity supply

$1,500engineer earns $700

Connect the property: live consumer unit on site.

Who it's for

HomesBusinesses

Money

Customer pays $1,500; the engineer is paid $700 wages when it's signed off. The rest goes to the company.

Certificate

Electrical installation (Part P) required to accept this job.

How it's created

Raised automatically for customers around the city, and by customers on the phone.

How the server checks it was really done

A consumer unit must be live on site — really powered from the grid.

Parts used from company stock

1 × Consumer unit20 m Twin & earth cable

Training: Electrical supply & EV charging — the full step by step, tools, PPE and hazards for this job.

EV charger installation

$1,100engineer earns $450

Fit a wallbox or charging post, live and working.

Who it's for

HomesBusinesses

Money

Customer pays $1,100; the engineer is paid $450 wages when it's signed off. The rest goes to the company.

Certificate

Electrical installation (Part P) required to accept this job.

How it's created

Raised automatically for customers around the city, and by customers on the phone.

How the server checks it was really done

A EV wallbox or EV charging post must be live on site — really powered from the grid.

Parts used from company stock

1 × EV charger15 m Twin & earth cable

Training: Electrical supply & EV charging — the full step by step, tools, PPE and hazards for this job.

Training & safety

Each group of jobs has a course in OPS Academy: the lesson below, a health & safety module, an exam and a practical. You can read all of it here, or take it on OPS Hub → Classroom, in the OPS Academy app on the phone or laptop, or at opsacademy.sa in game.

Electrical installation (Part P) · certificate required

Electrical supply & EV charging

Connect new electricity supplies and EV chargers so sockets and chargers are live.

Overview

Power comes from the grid (substations and feeders) over poles to a service cut-out and meter at each property, then into a consumer unit that feeds sockets, lights and chargers. A supply is only live when every link is complete and the grid is energised — in a power cut nothing downstream works. Jobs check that the consumer unit or charger near the site is live.

The equipment — and what it does

Service cut-out & meter

Where the supply enters the property and is measured.

/towers → San Andreas Power & Light → Customer supply & metering.

Consumer unit

Feeds sockets and lights around it through breakers.

/towers → SAPL → Fuse boards & isolators.

EV charger (wallbox / post)

Charges electric vehicles from its own circuit.

/towers → SAPL → EV charging.

Power cable

Service drop, LV and mains cable linking it all.

Run power cable / Run mains cable from the SAPL menu.

Tools & protective equipment

Multimeter / voltage tester

Proves a circuit is dead before you touch it, and measures voltage, continuity and resistance.

Lock-off kit

Padlocks and tags that stop anyone switching a circuit back on while you work on it.

Torque driver

Tightens electrical terminals and rack rails to the correct torque — not too loose, not stripped.

Cordless drill & fixings

Drills walls for cable entry and fixes brackets, cameras and boxes with the right plugs and screws.

Ladder

Reaches walls, ceilings and pole steps. Place it at a 1-in-4 angle on firm ground.

Insulated gloves PPE

Rated gloves for work near live electrical parts and for sharp metal edges.

Safety glasses PPE

Protect your eyes from fibre shards, drilling dust and laser light.

Hi-vis vest & hard hat PPE

Makes you visible to traffic and protects your head from falling objects and low beams.

Step by step

  1. Isolate and prove deadLock off the supply and prove dead with a voltage tester before touching anything.
    At the cut-out / consumer unit Lock-off kit about 8 s in game
  2. Fit the supply kitPlace the cut-out, meter and consumer unit (or the EV charger) from the SAPL menu.
    /towers → San Andreas Power & Light Cordless drill & fixings about 8 s in game
  3. Run the cablesRun the service drop from the pole and mains cable to the consumer unit / charger.
    Pole to property Ladder about 8 s in game
  4. Terminate to torqueTighten every terminal with the torque driver.
    Each terminal Torque driver about 8 s in game
  5. Test and energiseRemove the lock-off, switch on and test. The check needs the kit live.
    Consumer unit / charger Multimeter / voltage tester about 8 s in game
  6. CompletePress Check on the job.
    OPS Work → the job about 8 s in game

Health & safety — hazards and controls

Electricity

Mains voltage can give a fatal shock and cause burns.

Never open powered kit. Isolate and prove dead with a voltage tester before touching terminals.

Isolation

Someone switches the circuit back on while you work.

Lock off and tag the isolator; keep the key with you.

Working at height

A fall from a ladder or pole can cause serious injury.

Use a ladder at a 1-in-4 angle on firm ground with three points of contact. Above 2 m on a pole, clip on your harness.

What goes wrong if it's done badly

Not proving dead

With incidents on you can get a shock and be hurt. It's logged as a safety breach.

Supply not connected back to the grid

The consumer unit is dead: sockets, chargers and lighting won't work, and the check fails.

Grid outage in the area

Nothing is live until San Andreas Power & Light restores the feeder — the check fails until then.

Assessment

Safety module · 3 questionsExam · 5 questions in this modulePractical at an OPS Academy training centre (if switched on) Open in the Classroom →

Certificates

CertificateValid forNeeded for
Electrical installation (Part P)60 daysNew electricity supply, EV charger installation, solar_install

Stock & suppliers

Parts this company keeps in stock. Jobs use them up; managers reorder from suppliers with purchase orders, and stock below its minimum raises an alert.

PartUnitCostReorder belowSupplier
Consumer unit
cu
each$1602PowerCore Electrical
2 h delivery · On account
EV charger
ev
each$7801PowerCore Electrical
2 h delivery · On account
Twin & earth cable
tw
m$1100PowerCore Electrical
2 h delivery · On account

Other companies